Saturday, November 19, 2005

Cal has everything mapped out. He mixes the cement, pours it into the tractor bucket. After two loads he dumps the tractor load into the form. It takes about 8 or 9 tractor loads. He has now rigged up lights so that he can do one slab an evening and he hopes to do 3 a week. He has 31 slabs to do and today he completed # 6!

0 Comments:

Post a Comment

<< Home